Below is a list of executed projects to specifications by client standard. .
S/N | Project Title | Client Name | Scope of Work/Specifications | Project Cost |
1. | Construction of Jimoh Odutola Road, Surulere, Lagos | Lagos State Government | Construction of 18km length of Asphalt road with side drainages, median and crossings | N1.4Billion |
2. | Construction of Internal Road network (Asphalting) | Flour Mills Nigeria Limited | Asphalting of Road Network | N250Million |
3. | Construction of Mubi Mayobani-baza Road project | Adamawa State Government | Construction of 52km Dual carriage way | N3.25Million |
4. | Construction of Ifako-Ijaye General Hospital Waste water treatment plant | Lagos State Government (Ministry of Health) | Survey work; provision and installtion of MBR packaged treatment plant; Construction of sewer network; Construction of Lift station, etc | N63Million |
5. | Construction of Ansar Ud Deen Community Primary School, Itire, Lagos | Lagos State Government (World Bank Assisted project) | Construction of Blocks of Classrooms; Installation of Furniture; Installation of Laboratory equipment, etc. | N345Million |
7 | Construction of Filling Station at Ekpoma, Edo State. August 2018 | Matrix Energy Limited | Construction, Underground pipe laying, Fuel pumps and building of fuel station | N80 Million; |
8 | Construction of Filling Station at Akure, Ondo State November, 2018 | Prudent Energy Limited | Construction, Underground pipe laying, Fuel pumps and building of fuel station | N80 Million; |
9 | Construction of Filling Station at Ado Ekiti, Ekiti State, March 2019. | Prudent Energy Limited | Construction, Underground pipe laying, Fuel pumps and building of fuel station | N80 Million; |